What Is a Routing (BOP)?
A routing (Bill of Process / BOP) is the production definition that sets out the sequence of operations needed to make a product, which machine or work centre each operation is performed on, standard setup and cycle times, and the resources required (mould, tool, competence). The BOM answers “what”, the routing answers “how”.
- Routing = list of operations: sequence no., operation name, work centre/machine, setup time, unit cycle time.
- Additional information: alternative machine, mould/tool, required operator competence, control plan link.
- Users: planning/scheduling, costing, production, quality.
- Benefit: realistic due dates, correct capacity load, consistent production.
- Standard times should be updated with real data.
The Structure of a Routing
A routing consists of sequential operation lines. A sample machining routing:
| Op. | Operation | Work centre | Setup (min) | Cycle (s/unit) |
|---|---|---|---|---|
| 10 | Cutting | Band saw | 15 | 20 |
| 20 | Turning | CNC turning line | 45 | 90 |
| 30 | Milling | Vertical machining | 60 | 120 |
| 40 | Quality inspection | Measurement room | 0 | 30 |
| 50 | Packing | Packaging | 5 | 10 |
An alternative machine, required mould/tool, control plan, work instruction and required operator competence can also be linked to each line.
Why Does the Routing Matter?
Scheduling: When a work order will be on which machine in the Gantt chart is calculated from the sequence and times in the routing. Without a routing, the schedule relies on guesswork.
Capacity: The load of each work centre is the sum of the times of the routings passing through it. Bottleneck analysis relies on routing data.
Due dating: When an order will be finished is derived from the total time in the routing and machine availability.
Costing: Labour and machine cost are calculated as operation times × hourly rate.
Production discipline: The operator opens the routing operation on the HMI; moving to an out-of-sequence step can be blocked, and the related work instruction and control plan appear automatically.
The Relationship Between Routing and BOM
The BOM and the routing complement each other. Which operation consumes which materials is determined by the link between a BOM line and a routing operation. For example, in cable production PVC granules are consumed in the insulation operation and reels in the spooling operation. Thanks to this link, consumption is recorded at the right operation and work in process (WIP) is calculated correctly at each step.
Implementation Steps
- Define the work centres. Machine, machine group or line? Capacity is calculated on this unit.
- Sequence the operations. Indicate steps that can be done in parallel and mandatory sequences.
- Enter standard times. Setup and cycle should be kept separate; setup is per batch, cycle is per unit.
- Define alternatives. A second machine on which the same operation can be done, and the time difference.
- Link resources. Mould, tool, competence, control plan, work instruction.
- Update with real data. If the actual times measured by the MES consistently deviate from the standard, correct the routing.
Common Mistakes
- Mixing setup and cycle: In small batches the setup share is large, so a single “average time” misleads the schedule.
- Settling for a single routing: If no alternative machine is defined, planning gets stuck when a breakdown occurs.
- Not versioning: When the routing changes, which routing old work orders were produced with is lost.
- Never updating the routing: Times entered at set-up remain for years; the schedule drifts away from reality.
Frequently Asked Questions
What is the difference between a routing and a BOM?
What is an alternative routing?
Where do standard times in the routing come from?
Routing (BOP) in EFFIX MES
In EFFIX MES the routing (BOP) is part of the product definition together with the BOM: operation sequence, work centre, setup and cycle times, alternative machine, required mould/tool and control plan link are defined here. Work orders are derived from this routing; Gantt and Kanban views, capacity analysis and order due-dating use routing times. When the operator opens a routing operation on the HMI terminal, the related digital work instruction and document are displayed. Real cycle times measured in production are reported for reviewing routing standards. For details, see the EFFIX MES page or request a demo.