What Is a BOM (Bill of Materials)?

What Is a BOM (Bill of Materials)?

A BOM (Bill of Materials, also called a product tree) is a definition that lists all raw materials, semi-finished goods, components and auxiliary materials needed to make a product, together with their quantities and hierarchical structure. It is the shared reference data for planning (MRP), costing, purchasing and production traceability.

In brief

  • Structure: finished product → sub-assemblies / semi-finished goods → raw materials (multi-level tree).
  • Each line holds: material code, unit, standard quantity, scrap allowance, validity.
  • Types: engineering BOM (EBOM), manufacturing BOM (MBOM), variant BOM, recipe.
  • Users: planning, purchasing, costing, production, quality.
  • Benefits: correct material requirements, correct costs, consistent production.

Structure of a BOM

A simple BOM is single-level: the product and its direct inputs. In multi-stage production it becomes multi-level; each semi-finished product has its own BOM. Example:

  • Cable 3×2.5 mm² (1 m)
    • Insulated core 2.5 mm² — 3 m
      • Copper wire — 0.067 kg
      • PVC insulation granules — 0.012 kg
    • Filler — 0.010 kg
    • Sheath granules — 0.045 kg
    • Reel (packaging) — 0.002 pcs (1 per 500 m)

Each line defines the material code, unit, the quantity needed for one unit of product and any scrap allowance. The number of levels depends on the product’s complexity.

Types of BOM

TypePurposeUsed by
Engineering BOM (EBOM)The product’s design structureR&D, design
Manufacturing BOM (MBOM)How it is actually made in the factory, including packaging and auxiliary materialsPlanning, production, MES
Variant / configurable BOMStructures that differ by colour, size or customerCompanies producing a wide variety of products
Recipe (formula)A structure with ratios, sequence and parameters in the process industryFood, chemicals, plastic compounding

Why Is the BOM Important?

The BOM is the most frequently referenced definition in a production system. MRP calculates material requirements by multiplying order quantities by the BOM; a wrong BOM leads to under- or over-purchasing. Cost accounting builds the standard cost on the BOM. In production, operators see which material to use from the BOM; quality compares actual consumption with the BOM standard. If the BOM is wrong, every link in this chain is wrong.

BOM and Routing

The BOM answers “what will be used”, while routing (BOP) answers “with which operations, on which machines and in how much time”. Together they form the production definition. A BOM line is usually tied to a specific routing operation: sheath granules are consumed in the sheathing operation, the reel in the winding operation. Without this link, nobody knows in which operation consumption should be recorded.

Common Mistakes

  • Missing or fixed scrap allowance: If standard consumption is unrealistic, variance reports and MRP are misled.
  • No version management: A material change overwrites the old BOM; which structure past work orders were produced with is lost.
  • Unit inconsistency: The BOM uses kg, the warehouse bags and production metres; if conversion is undefined, quantities do not match.
  • Duplicating variants as separate products: Opening a separate BOM for each colour multiplies maintenance work; a variant structure should be preferred.

Frequently Asked Questions

What is the difference between a BOM and a recipe?
In discrete manufacturing (assembly, machining) the material list is called a BOM; in process industries (food, chemicals, plastic compounding) the same concept is called a recipe. A recipe usually also includes percentages, sequence and process parameters. The core logic is the same.
Why do the engineering BOM and manufacturing BOM differ?
The engineering BOM (EBOM) reflects the product’s design structure, while the manufacturing BOM (MBOM) reflects how it is actually made in the factory. The same part may be a single item in design but several items in production, together with semi-finished goods and packaging. MES and MRP use the manufacturing BOM.
How is the scrap allowance defined in a BOM?
Standard consumption is defined by adding the expected scrap percentage to the theoretical quantity. For example, if the theoretical quantity is 1.00 kg and expected scrap is 3%, standard consumption is 1.03 kg. The scrap allowance should be updated regularly with real production data.

The BOM in EFFIX MES

EFFIX MES keeps multi-level BOM and routing (BOP) definitions together; each BOM line is linked to the relevant operation and consumption is recorded at that operation. The variant and recipe structure makes it possible to manage different versions of the same product without duplicating BOMs; unit conversion definitions keep warehouse, production and sales units consistent. Actual consumption is compared with the BOM standard and variances are reported, and produced lots are matched with the BOM structure in the product genealogy. BOM data can be synchronised with ERP. For details, see the EFFIX MES page or request a demo.