What Is a Control Plan?

What Is a Control Plan?

A control plan is a quality document that defines in a single table which characteristics of a product or production process will be checked, by which measurement method, how often and with what sample size, by whom, and what will be done in case of non-conformance. It is one of the mandatory outputs of the automotive APQP process and the IATF 16949 standard.

In brief

  • Each row is a process step + a characteristic; each column is “what, how, how often, who, what to do on deviation”.
  • There are three stages: prototype, pre-launch and production.
  • Its inputs are the Process FMEA and the process flow chart; its outputs are work instructions and SPC charts.
  • Product characteristics (diameter, hardness) are kept separate from process characteristics (temperature, pressure).
  • It is prepared by a cross-functional team led by a quality engineer.

What Is a Control Plan?

A control plan moves quality away from the “we’ll check it at the end” approach and distributes it to every process step. For a cable line, it says what will be measured at every step from raw material receipt to extrusion, cooling and winding. This way the operator, the quality inspector and the auditor all look at the same document; the question “who was taking this measurement, and when?” disappears.

Why Does It Matter?

  • Consistency: Even when shifts and operators change, the checks stay the same.
  • Evidence: In a customer audit, “planned checks” can be compared with “checks performed”.
  • Risk focus: Thanks to the link with FMEA, check intensity is proportional to risk; you measure what matters, not everything.
  • Fast reaction: What to do in case of deviation is written down in advance; the line does not wait for a decision.

Columns of the Control Plan

ColumnDescriptionExample
Process stepOperation in the flow chart20 – Extrusion
CharacteristicProduct or process featureOuter diameter (product) / Head temperature (process)
Special characteristicCritical/significant markCC, SC
SpecificationNominal and tolerance5.00 ± 0.10 mm
Measurement methodInstrument, techniqueLaser diameter gauge
Sample size / frequencyHow many parts, when5 pcs / hour
Control methodHow it is recordedX̄-R chart
Reaction planWhat to do on deviationStop the line, quarantine the last hour, notify the quality engineer

How Is It Prepared?

  1. Map the process flow chart: Each operation is numbered.
  2. Complete the PFMEA: High-risk failure modes and current controls are identified. See What Is FMEA?
  3. List the characteristics: Special characteristics are taken from the customer drawing, and risky process parameters from the FMEA.
  4. Set the measurement method and frequency: The adequacy of the measurement system (calibration, repeatability) is verified.
  5. Write the reaction plan: A concrete action and owner for each row.
  6. Approve and publish: A revision number is assigned; work instructions on the shop floor are updated according to the plan.

Common Mistakes

  • Preparing the plan only because the customer asks for it and not applying it on the shop floor. Auditors ask for “records of what was done”.
  • Writing “quality is informed” in the reaction plan column; that is not a plan.
  • Tying every characteristic to 100% inspection; cost rises and what matters gets missed.
  • Not updating the plan when the FMEA changes; the two documents drift apart.
  • Copies of different revisions of a paper plan circulating on the lines.

Frequently Asked Questions

What is the relationship between the control plan and FMEA?
The current controls defined for high-risk failure modes identified in the Process FMEA are the input to the control plan. FMEA analyses the risk; the control plan defines how you will monitor that risk in daily production. When one changes, the other must be updated too.
Who prepares the control plan?
Usually a cross-functional team led by the quality engineer, including the process engineer, the production supervisor and, where needed, maintenance and purchasing. A plan written by one person at a desk is not applied on the shop floor; the operator’s input is critical.
When is the control plan updated?
When the product design, process, machine, measurement method, supplier or customer requirement changes; after recurring non-conformances or customer complaints; and when the FMEA is revised. An annual review is also good practice.

The Control Plan in EFFIX MES

In EFFIX MES, the control plan is not a static document but a definition that drives production: characteristic, specification, measurement method and frequency are defined per product and operation; quality tasks automatically appear on the operator’s HMI terminal with triggers such as work order start, a set time or a production count. Measurements entered feed SPC control charts and the Cp/Cpk calculation at the same time; an out-of-tolerance result can be linked to a non-conformance (NCR) record and, if necessary, lot blocking. If you want the plan to be truly applied on the shop floor, see the EFFIX MES page or request a demo.