What Is Scrap Rate? How Is It Calculated?
Scrap rate is the percentage share of product or material that becomes unusable during production within total production or consumption. In addition to rejected parts, setup losses, cutting allowances and process waste are also included in scrap. Scrap rate is one of the most direct indicators of both cost and quality performance.
- Formula: Scrap Rate = (Scrap Quantity ÷ Total Quantity) × 100
- The unit depends on the product: pieces, metres, kilograms, litres.
- Scrap ≠ rejects. Scrap covers rejects, setup losses and process waste together.
- It directly affects the quality component of OEE.
- For meaningful management, scrap must always be recorded together with its reason .
Types of scrap
- Setup scrap: Material spent until the process stabilises after a mould or recipe change. It is usually fixed and predictable; its rate rises as batch size shrinks.
- Production scrap: Defective products made during series production. It shows process stability.
- Process scrap: Loss inherent to the process, such as cutting allowance, flash, runners and start/end waste.
- Material-related scrap: Raw material defects or use of the wrong material.
A scrap report that does not make this distinction cannot guide improvement work. A scrap rate that looks high on small batches may actually be setup-related; in that case the solution lies in SMED and batch size, not in quality.
Example calculation
| Data | Value |
|---|---|
| Total production | 12,000 pcs |
| Setup scrap | 180 pcs |
| Production scrap | 240 pcs |
| Total scrap | 420 pcs |
| Scrap rate | (420 ÷ 12,000) × 100 = 3.5% |
When you break down the same data, setup scrap appears as 1.5% and production scrap as 2.0%. The two figures go to two separate action teams.
Scrap rate and OEE
The quality component of OEE is the ratio of good product to total production. So when scrap increases, OEE drops directly. But there is a point to note: the time spent producing scrap also kept the machine busy. In other words, scrap both lowers the quality component and consumes capacity during that time. That is why scrap reduction work is often capacity creation work.
Ways to reduce scrap rate
- Code the reason: Analysis done without a reason code on every scrap record is just guesswork.
- Apply Pareto: Most scrap usually comes from a small number of reasons; invest in those reasons first.
- Monitor the process with SPC: Control charts let you see the deviation before the product is scrapped.
- Shorten setup time: SMED work directly reduces setup scrap.
- Set up traceability: Without the answer to which lot, which mould and which operator the scrap occurred with, the root cause cannot be found.
- Reconcile with ERP: If scrap recorded in the MES does not go to the ERP together with the production confirmation, inventory and cost data do not reflect reality.
Common mistakes
- Entering scrap in bulk only at the end of the shift; this loses the reason and the time.
- Confusing setup scrap with production scrap and holding the quality team responsible.
- Unit inconsistency: recording the same product sometimes in metres and sometimes in kilograms makes the report meaningless.
- Presenting scrap recording as a punishment for the operator; this leads to records not being entered at all.
Frequently Asked Questions
How is scrap rate calculated?
What is the difference between scrap and rejects?
What is an acceptable scrap rate?
Scrap Rate in EFFIX MES
In EFFIX MES, scrap is collected on the shop floor as an integral part of the production record: the operator enters the quantity and reason code on the HMI terminal, and if there is a reject counter on the machine, it is read automatically. Thanks to unit conversion support, conversions between metres, kilograms and pieces stay consistent. Recorded scrap is linked to material, mould, shift and operator through lot traceability and product genealogy, and is reflected directly in the quality component of OEE and in consumption tracking. With the flexible report designer and pivot reports, scrap reasons are examined as a Pareto, the Proactive Alert System (PAS) generates an alert when a threshold is exceeded, and production and scrap confirmations are transmitted automatically on the MES→ERP line. To set up end-to-end scrap tracking, see the EFFIX MES page or request a demo.