What Is the ISA-18.2 Alarm Management Standard?

What Is the ISA-18.2 Alarm Management Standard?

ISA-18.2 (IEC 62682) is the international alarm management standard that defines the design, prioritisation, operation and continuous improvement of alarm systems in industrial plants. Its main aim is to ensure that only meaningful, prioritised alerts that can be turned into action reach the operator, and to eliminate problems such as alarm floods, standing alarms and unnecessary notifications through a life-cycle approach.

In brief

  • Alarm = notification of an abnormal condition requiring operator action; without an action, it is not an alarm.
  • Life cycle: philosophy → identification → rationalisation → design → implementation → operation → maintenance → monitoring → management of change → audit.
  • The cause, consequence, priority and operator action of every alarm are documented (rationalisation).
  • Performance target: on average fewer than 1 alarm per 10 minutes per operator; 10+ alarms in 10 minutes is a “flood”.

What Is ISA-18.2 and Why Did It Emerge?

From the 1990s onwards, digital control systems made adding alarms almost free. The result: thousands of alarm points on an operator’s screen, most never looked at, some ringing constantly. Investigations of major industrial accidents found that the critical alarm was lost among dozens of unimportant ones. ISA published the 18.2 standard in 2009 in response to this problem; in 2014 it was internationalised as IEC 62682.

The Alarm Life Cycle

The backbone of the standard is that it sees an alarm not as something set up once and forgotten, but as a managed asset:

  1. Alarm philosophy: The plant’s alarm principles, priority classes and performance targets are defined as a written document.
  2. Identification: Which conditions require an alarm is determined (HAZOP, process analysis, field experience).
  3. Rationalisation: Every alarm candidate is questioned: why? what is the consequence? what will the operator do? within how much time? If these questions have no answer, the alarm is deleted.
  4. Detailed design: Threshold, delay, hysteresis, priority and screen display are designed.
  5. Implementation and operation: Commissioning, operator training, shift handover notes.
  6. Monitoring and assessment: Alarm rate, the 10 most frequent alarms and standing alarms are reported regularly.
  7. Management of change and audit: Threshold changes are recorded and the system is audited periodically.

Prioritisation

The standard recommends setting an alarm’s priority along two axes: the severity of the consequence (safety, environment, equipment, production loss) and the time the operator has to respond. A common distribution target is:

PriorityTarget shareExample
High / emergency~5%Safety interlock, risk of equipment damage
Medium~15%Quality deviation starting, planned time exceeded
Low~80%Maintenance due soon, performance drop

If half of the alarms are defined as “high”, priority has lost its meaning.

Performance Metrics

  • Average alarm rate per operator: target below 1 per 10 minutes, acceptable limit 2 per 10 minutes.
  • Alarm flood: a period with more than 10 alarms in 10 minutes; less than 1% of total time should be in flood.
  • Stale alarm: an alarm active for more than 24 hours; target fewer than 5.
  • Top 10 alarms: these 10 usually generate most of all alarms; improvement starts here.
  • Chattering alarm: an alarm that repeatedly turns on and off in a short time; fixed with delay and hysteresis.

ISA-18.2 in Discrete Manufacturing

Although the standard came out of process plants, factories making parts catch the same disease: every machine stop, every efficiency drop and every quality deviation turns into an e-mail or notification, and soon nobody reads them. The ISA-18.2 logic applies here too: an alert should be generated only when someone can do something, its priority and recipient should be clear, its acknowledged/resolved status should be tracked, and unnecessary alerts should be weeded out periodically.

Frequently Asked Questions

What is an alarm according to ISA-18.2?
An alarm is an audible and/or visual notification of an abnormal condition that requires operator intervention. According to the standard, a notification is not an alarm if there is no action the operator can take; it is only an information message and should not be on the alarm list.
What is an alarm flood?
It is far more alarms arriving in a short time than the operator can process. The standard considers more than 10 alarms in 10 minutes a flood. During a flood the critical alarm gets lost in the noise; it is prevented with rationalisation and suppression mechanisms.
Does ISA-18.2 apply only to the process industry?
The standard came out of process plants such as petrochemicals and energy, but its principles also apply to discrete manufacturing. Alerts for machine stops, efficiency drops and quality deviations have the same problem: too many, unprioritised notifications that do not turn into action.

ISA-18.2 in EFFIX MES

The EFFIX MES Proactive Alert System (PAS) is designed with the ISA-18.2 approach: more than 20 detectors, such as downtime, efficiency, quality, checklist and predictive maintenance anomaly, are put into service by defining threshold, priority and recipients with the rule wizard. Alerts are delivered as e-mails and notifications; an action such as opening a maintenance work order can be linked to each alert, preventing the “notification without action” situation. Alert types closed by the operator stay closed; unnecessary alert generation is weeded out this way. For details, see the EFFIX MES page or request a demo.