How Is MES Used in Plastic Injection Moulding?

How Is MES Used in Plastic Injection Moulding?

MES in plastic injection moulding is a manufacturing execution system that automatically collects cycle and status data from injection moulding machines, counts production per cavity, tracks mould mounting/dismounting and life, and records downtime and scrap reasons. The defining feature of this type of production is that output depends directly on the machine cycle and the mould structure.

In brief

  • Machine connection: Euromap 63 / Euromap 77 interfaces; signal and counter retrofit on machines without an interface.
  • Production quantity = number of cycles × number of active cavities; blocked cavities must be defined.
  • The critical asset is the mould: where is it, on which machine, how many shots has it made, when should it be maintained?
  • Key indicators: OEE, actual vs theoretical cycle time difference, scrap rate, mould change (setup) time.
  • Frequent losses: micro stops, slow cycles, material drying and first-shot scrap.

Features of Injection Moulding from an MES Perspective

  • Cycle-based output: The machine runs on a regular cycle; small deviations in cycle time create a large capacity difference by the end of the day.
  • Mould-centred structure: The same product can be made on different machines with different moulds; the capacity plan depends on moulds as much as on machines.
  • Long setup times: Mould changes and material and colour changes are the main source of setup loss.
  • High density of micro stops: Short stops such as parts not dropping or robot errors cannot be recorded by hand; they must be captured automatically.
  • Material traceability: Raw material lot, masterbatch and regrind ratio affect product quality; consumption recording should be set up accordingly.

Which Problems Does MES Solve?

Shop-floor problemMES approach
Production quantity is counted by handAutomatic quantity from Euromap/counter data with the cavity multiplier
Cycle time slows down unnoticedComparison with the theoretical cycle and a speed loss alert
Nobody knows where the mould is or how much it has runMould mounting/dismounting records and shot-based life tracking
Mould failures stop production unexpectedlyPlanned maintenance triggered by life threshold
Scrap reasons are not classifiedCoded scrap reasons and Pareto by mould/machine
The capacity plan ignores the mouldCapacity analysis constrained by machine, mould and labour

Points to Watch During Roll-Out

  1. Define the cavity count in the product-mould relationship. The operator should be able to report blocked cavities.
  2. Keep theoretical cycle times up to date. Old and wrong standard times make the performance indicator unusable.
  3. Set the micro stop threshold. How many seconds of pause count as a stop should be written down.
  4. Label mould identities. Life tracking only works correctly if the mould has an identity that can be read on the shop floor.
  5. Measure setup loss separately. SMED work cannot be done without measuring mould change time.

Common Mistakes

  • Counting cycles directly as units: If the cavity multiplier is not applied, the production quantity appears lower than it is.
  • Weighing scrap only at the end of the shift: Which mould and which cycle it came from is lost; the root cause cannot be reached.
  • Tying mould maintenance to the calendar: Maintenance by date instead of shot count takes some moulds in too early and others too late.
  • Not recording the regrind ratio: Use of regrind is a common but unrecorded cause of quality deviations.

Frequently Asked Questions

How does MES connect to the machine in plastic injection moulding?
For injection moulding machines, the common route is the Euromap 63 or Euromap 77 interface; these interfaces provide data such as cycle count, cycle time and machine status in a standard format. On older machines without an interface, counter and signal-based retrofit is used.
How does the number of cavities affect production tracking?
In one cycle, the machine produces as many parts as there are cavities in the mould. Production quantity is calculated as number of cycles × number of cavities. If the mould has blocked cavities and this multiplier is not updated, the production quantity appears higher than it is.
Why should mould life be tracked with MES?
Moulds wear depending on shot count. When the actual number of cycles is derived automatically from production, maintenance timing is set by real usage rather than guesswork; this reduces both unexpected mould failures and the cost of early maintenance.

Plastic Injection Moulding in EFFIX MES

EFFIX MES can connect to injection moulding machines via the Euromap 63 and Euromap 77 interfaces; on machines without an interface, counters and signals are read via OPC UA, Modbus or the Inolink wireless IoT network. The collected cycle data is presented as machine status, cycle time screens and OEE components; short stops are captured automatically and coded with their reasons. The mould/tool life and mounting/dismounting tracking module derives from production how long a mould has run on which machine and triggers planned maintenance; statistical anomaly detection is used on the predictive maintenance side. On the planning side, capacity analysis evaluates machine, mould and labour constraints together. Scrap and consumption records are linked to the raw material lot through lot traceability, and SPC and the control plan come into play on the quality side. For details, see the EFFIX MES page or request a demo.