
What Is Kanban?
Kanban, Japanese for “signal card”, is a card-based pull system that triggers production or material replenishment according to the actual consumption of the next process. One of the core tools of lean manufacturing, Kanban replaces forecast-based push production with the principle “produce and move only what has been consumed”, limiting work-in-process and preventing overproduction.
- Principle: the next process consumes; the previous process only replaces what was consumed.
- Two main types: production Kanban (produce signal) and withdrawal/transport Kanban (bring signal).
- Number of cards = (daily demand × replenishment time × (1 + safety)) / container size.
- The number of cards sets the stock ceiling; reducing cards reduces stock.
- Digital Kanban: a system signal instead of a card, work order flow on a board.
What Is Kanban?
In traditional push production, each station produces the quantity the plan gives it and does not look at whether the next station needs it; the result is piles of work-in-process. With Kanban, when a container empties, the card on it returns to the previous station and gives the signal “produce this much”. No card, no production. This way, total stock in the system is limited by the number of cards in circulation, and problems (long setups, breakdowns, quality) cannot hide behind stock.
Types of Kanban
- Production Kanban: Instructs the previous process to “produce this many of this part”.
- Withdrawal (transport) Kanban: Triggers bringing material to the station from the supermarket or warehouse.
- Supplier Kanban: Sends a shipment signal to an external supplier.
- Signal Kanban: Marks the reorder point in batch production (triangle Kanban).
- Electronic Kanban (e-Kanban): A barcode/system record instead of a physical card; triggered by the MES or ERP.
How Is the Number of Cards Calculated?
| Input | Example value |
|---|---|
| Daily demand | 400 pcs |
| Replenishment time | 2 days |
| Safety factor | 0.2 |
| Container size | 100 pcs |
| Number of cards | (400 × 2 × 1.2) / 100 = 9.6 → 10 cards |
Once the system has settled, stock is reduced by gradually lowering the number of cards; when a problem appears (waiting, missing parts), the root cause is solved and it is tried again.
How Is It Implemented?
- Choose a repetitive product family with relatively stable demand.
- Determine the supermarket (controlled stock area) location and container size.
- Calculate the number of cards; design the cards and card boxes.
- Standardise card flow rules visually: who, when, where.
- Track stock and waiting data; adjust the number of cards accordingly.
Common Mistakes
- Producing without a card: Producing without a card “because it will be needed anyway” turns the system back into push.
- Never updating the number of cards: When demand changes, the cards should change too.
- Moving to Kanban without solving setup and breakdown problems: Kanban exposes these problems but does not solve them.
- Lost cards: When a physical card is lost, the stock ceiling breaks; e-Kanban prevents this.
Frequently Asked Questions
How is the number of Kanban cards calculated?
Is production Kanban the same as software Kanban?
Does Kanban work in every type of production?
Kanban in EFFIX MES
The EFFIX MES planning module presents work orders in a Kanban view as well as Gantt: work orders move between stages such as waiting, in production and completed, and the workload in front of each station can be seen at a glance. WIP tracking and consumption records make it possible to monitor supermarket levels against actual consumption; with label/DataMatrix generation, containers become defined in the system and the risk of losing physical cards disappears. The Proactive Alert System can send a notification to the person responsible when a WIP or stock threshold is exceeded. To digitise your pull-based flow, see the EFFIX MES page or request a demo.
