What Is Kaizen?
Kaizen is a management approach meaning “continuous improvement”, derived from the Japanese words “good” (zen) and “change” (kai). In production, Kaizen means raising productivity, quality and safety step by step through small, low-cost and continuous improvements made with employee participation, instead of large investments.
- Meaning: improvement in small steps, continuously and with everyone’s participation.
- Method: the PDCA cycle (Plan – Do – Check – Act).
- Two forms: daily Kaizen (individual suggestions) and the Kaizen event (3-5 days of team work).
- Measure: comparison of OEE, downtime, scrap and cycle time before and after the improvement.
- Whose job: everyone from operator to manager; ownership should be on the shop floor.
What Is Kaizen?
Kaizen is the practical counterpart of the fifth principle of lean manufacturing, “pursue perfection”. Its basic assumption is that no process is perfect and that the best improvement ideas come from the people actually doing the work. That is why Kaizen is not an engineering project but a working culture. Small improvements may look insignificant on their own, but accumulated over a year they make a big difference.
The PDCA Cycle
The methodological framework of Kaizen is the PDCA cycle:
- Plan: Define the problem with data (e.g. “6 hours of unplanned downtime per week on line B”). Investigate the root cause; use tools such as 5 Whys and the fishbone diagram.
- Do: Try the solution on a small scale.
- Check: Measure the same indicator again; is there improvement?
- Act: If it worked, standardise it (update the work instruction); if not, start the cycle again.
How Is a Kaizen Event Run?
A Kaizen event (Kaizen blitz) is 3-5 days of intensive team work focused on a specific area:
- Day 1: Setting scope and goals, measuring the current state (downtime records, cycle times, VSM).
- Days 2-3: Root cause analysis, solution alternatives, trials on the shop floor.
- Day 4: Implementation, writing the new standard, training.
- Day 5: Measuring results, presenting to management, follow-up plan.
Why Is It Important?
Kaizen takes improvement out of being a single department’s job and spreads it across the whole plant. When operators make a suggestion and see it implemented, ownership develops. Its lasting effect is that problems become a topic of discussion instead of being hidden. And because it does not require large investment, its payback is fast.
Common Mistakes
- Kaizen without measurement: A feeling that “it got better” is not enough; before and after should be compared with the same indicator.
- Not standardising: If the improvement is not written into the work instruction, the old practice returns within a few weeks.
- Leaving the suggestion system unanswered: Suggestions that are not evaluated kill participation.
- Focusing on the wrong place: The most visible problem may not be the biggest loss; Pareto analysis should be done with data.
Example
At an injection moulding plant, downtime reports show that “waiting for material” accounts for a third of unplanned stops. The Kaizen team changes the raw material supply route and clarifies who is responsible for supply. Two weeks later, when the same report is run again, waiting-for-material time has dropped noticeably; the new flow is written into the work instruction.
Frequently Asked Questions
What is the difference between Kaizen and Kaikaku?
How long does a Kaizen event (Kaizen blitz) last?
How are Kaizen results measured?
Kaizen in EFFIX MES
EFFIX MES feeds the “Plan” and “Check” steps of Kaizen with data: downtime reason records, OEE components and cycle time screens show which loss is biggest; after the improvement, the same reports are run again to measure the impact. With the flexible report designer and pivot reports, before/after comparisons are prepared without writing code. Thanks to digital work instructions, the new standardised method is shown directly to the operator on the HMI operator terminal. To make your continuous improvement cycle measurable, see the EFFIX MES page or request a demo.