What Is Preventive Maintenance?

What Is Preventive Maintenance?

Preventive maintenance is maintenance carried out on a planned basis, according to a set calendar, running hours or cycle count, before equipment fails. It covers tasks such as lubrication, filter changes, belt checks, calibration and adjustment. Its aim is to manage known wear behaviour with a predictable programme instead of waiting for failure.

In brief

  • Trigger: calendar, actual running hours or cycle count.
  • Scope: lubrication, filter/belt replacement, calibration, cleaning, inspection and adjustment.
  • Measures: planned maintenance compliance, unplanned downtime rate, MTBF trend.
  • Main benefit: less unplanned downtime and maintenance work that can be planned.
  • Risk: maintenance done more often than necessary means replacing good parts early.

Why preventive maintenance?

Intervening after a failure (corrective maintenance) is the most expensive method, because the stop happens in the middle of the production plan, unprepared and often without spare parts. Preventive maintenance moves this work into a predictable window:

  • Maintenance is placed in a planned time slot when production is stopped.
  • Spare parts are prepared in advance, so lead times are no surprise.
  • Labour can be planned; the need for midnight emergency call-outs falls.
  • Equipment availability, and therefore the availability component of OEE, improves.

How do you set up a preventive maintenance plan?

  1. Take an equipment inventory: Every machine and critical component should be defined.
  2. Determine criticality: Prioritise by failure cost, bottleneck impact and safety risk. Not every piece of equipment gets the same intensity of maintenance.
  3. Write the task content: For each maintenance task, a step-by-step checklist, required parts and estimated duration should be defined.
  4. Choose the interval: Start with the manufacturer’s recommendation and update it with your own failure history. Running hours are usually more accurate than the calendar.
  5. Link it to the schedule: The maintenance window should be scheduled so that it does not clash with the production plan.
  6. Feed back: Findings from the work done should be recorded and used to update the interval.

Calendar or running hours?

CriterionCalendar-basedRunning hours/cycle-based
Set-upSimpleRequires data collection
AccuracyMisleading on low-utilisation machinesReflects real wear
RiskEarly or late maintenanceIf counter data is interrupted, the plan goes off track

In factories where the number of shifts varies, planning based on running hours almost always gives more accurate results.

Common mistakes

  • Making a plan without measuring compliance: A perfect plan on paper is just good intentions if its completion rate is not tracked.
  • Giving every piece of equipment the same interval: A plan that ignores differences in criticality is both expensive and ineffective.
  • Not recording findings after maintenance: The information that “the part was still in good condition” is valuable data for extending the interval.
  • Skipping autonomous maintenance: Without the operator’s daily check, the maintenance team has to rush to every small job.
  • Treating preventive maintenance as the only strategy: For critical equipment it needs to be used together with predictive maintenance.

Frequently Asked Questions

How is the preventive maintenance interval determined?
The manufacturer’s recommendation is used at the start, but it should be updated over time based on your own failure history. If no failures occur during the interval, it can be extended; if failures occur before the interval is up, it should be shortened. Actual running hours or cycle count are usually a more accurate measure than the calendar.
Are preventive maintenance and planned maintenance the same thing?
They largely overlap. Planned maintenance is a general term covering any maintenance scheduled in advance. Preventive maintenance is the part of it aimed at preventing failure: periodic tasks such as lubrication, filter changes, calibration, inspection and adjustment.
How is the success of preventive maintenance measured?
Three indicators are enough: planned maintenance compliance (share of tasks done on time), the change in unplanned downtime rate and the MTBF trend. If maintenance is being done but unplanned downtime does not decrease, the content or interval of the tasks should be reviewed.

Preventive Maintenance in EFFIX MES

In EFFIX MES, planned maintenance works on the same foundation as production data. Because machine status is collected from the shop floor in real time, maintenance intervals can be tied to actual running hours or cycle count as well as the calendar; mould and tool life tracking keeps mounting/dismounting and usage history with the same logic. The maintenance workshop and failure/downtime history modules record work done, findings and time spent; MTTR and MTBF indicators are calculated from them, and whether intervals are right is questioned with data. The digital checklist designer ensures that maintenance steps are fully applied on the shop floor, and when maintenance is due or skipped, the Proactive Alert System (PAS) can generate a notification and trigger the opening of a maintenance work order. To tie your maintenance plan to data, see the EFFIX MES page or request a demo.