A production dashboard is a visual management tool that shows the critical indicators of a factory or a line on a single screen and keeps them up to date. Its purpose is not to present data, but to allow the person looking at it to understand the situation within a few seconds and act if necessary. Good dashboard design therefore begins by determining who will use the screen and for which decision.

In brief
  • Identify the audience first: operator, shift supervisor, management.
  • 5-7 indicators on a shop floor display; each indicator should be tied to a decision.
  • Every value is shown with a reference: target, previous shift or trend.
  • Colour only conveys status; decorative colour reduces its warning value.
  • Users: shop floor teams, shift supervisors, production and plant management.

Identify the audience first

AudienceQuestionTime scale
OperatorWhere am I against my target?Right now, within the shift
Shift supervisorWhich machine do I need to attend to?Real time and shift
Production managerWhich line and product is causing problems?Day, week
Senior managementWhere is the trend heading?Month, quarter

Trying to serve all four audiences with the same screen is the most common design mistake. Each level should have its own screen, with shared definitions and a shared data source across screens.

Selecting indicators

There is a single criterion for an indicator to appear on a dashboard: when its value changes, does someone need to do something? If the answer is no, the indicator belongs in a report, not on a display.

  • Typical set for a shop floor display: machine status, shift target and actual, active downtime and its duration, scrap quantity, active alerts.
  • Typical set for a management dashboard: OEE and its components, downtime Pareto, scrap rate trend, on-time delivery rate, energy intensity.

Design rules

  1. Do not show a number without a reference. 1,240 units on its own is not information; its position against the target is.
  2. The most important information goes top left. The eye starts scanning from that point.
  3. Readability from a distance. If a shop floor display will be read from several metres away, font size and contrast must be chosen accordingly.
  4. Freshness indicator. The screen should show when the data was last updated; a frozen screen leads to wrong decisions.
  5. Avoid constant movement. Rotating and scrolling animations attract attention but reduce readability.
  6. Drill-down. If the screen is interactive, it should be possible to move from an indicator to the related detail list.

Refresh rates and technical considerations

How often a display is updated depends on the decision it serves. A shop floor display showing machine status is expected to update within seconds; shift targets within minutes, and management indicators within hours. Refreshing every indicator more often than necessary increases both system load and visual noise on the screen.

The second technical consideration for shop floor displays is resilience. When the display loses its connection, the screen must not present the last data as if it were current; it should instead give a clear connection warning. Otherwise a frozen screen creates the impression of a line running without problems.

Common mistakes

  • Filling the screen with indicators. White space is a load-bearing element of the design; a crowded display cannot be read.
  • Using pie charts. For a downtime breakdown with many categories, a Pareto bar chart is far more readable than a pie chart.
  • Leaving targets off the screen. If the target is not visible, the indicator is merely information and does not change behaviour.
  • One-off design. Displays should be reviewed periodically; an indicator nobody looks at any more should be removed.
  • Covering up data quality with the display. If downtimes with no reason entered appear as undefined, data collection should be fixed first.

Frequently Asked Questions

How many indicators should a dashboard have?
Five to seven indicators are usually enough on a shop floor display. Whoever looks at the screen should be able to understand the situation within a few seconds. The number of indicators may be slightly higher on a management dashboard, but any indicator not tied to a decision should be removed from the screen.
Can a shop floor display and a management dashboard be the same?
They should not be. The shop floor display answers the question of what is happening now, while the management dashboard answers the question of how the trend is developing. The time scale, level of detail and refresh frequency differ; making one screen serve two purposes weakens both.
How should colour be used on a dashboard?
Colour should only be used to give meaning to a status: on target, attention, action required. Decorative use of colour reduces its warning value. Because of colour blindness, colour should also be used together with an icon or text rather than on its own.

Production Dashboards in EFFIX MES

EFFIX MES provides dashboards and KPI displays within the same system as the production monitoring data; machine status, downtime, OEE components and scrap quantities are reflected on the displays in real time. Andon and factory displays can be configured for the shop floor and KPI displays for management level separately; with the 3D factory view, machine statuses can be monitored on the layout plan. Thanks to user-based settings, each role works with its own default display, and display content can be updated with the no-code report designer without waiting for technical support. For details, see the EFFIX MES page or submit a demo request.