How to Digitise Old Machines (Retrofit)
Digitising old machines (retrofit) is the process of automatically collecting data such as running status and production count by adding sensors, counters, input modules or wireless IoT nodes to existing machines that have no PLC or communication interface. Retrofit is the most economical way to move to digital production monitoring without replacing machines.
- Target data: running/stopped status, cycles/count, and energy and temperature if needed.
- Methods: signal lamp/relay output, current sensor, photoelectric/inductive sensor, vibration sensor, energy analyser.
- Transport: wired input module or wireless IoT node.
- Complement: operator terminal (downtime reason, scrap, work order).
- Benefit: OEE and downtime visibility across the existing machine park.
What Is Retrofit?
In many factories a significant part of the machine park is 15-30 years old, and most of these machines have no Ethernet port, OPC UA server or readable PLC. Instead of replacing them, adding small pieces of hardware that capture the physical signals they produce is called retrofit. The machine does not become “smart”, but when it runs, how many cycles it makes and how much energy it consumes become trackable.
Which Signals Are Taken From Where?
| Information needed | Signal source | Hardware |
|---|---|---|
| Running / stopped | Green/red signal lamp, main contactor auxiliary contact | Digital input module, optocoupler |
| Running (indirect) | Motor current | Clamp-type current sensor; above threshold = running |
| Count / cycle | Part output, press ram movement, mould closing | Photoelectric sensor, inductive sensor, mechanical counter output |
| Length (cable, extrusion, textiles) | Line speed, wheel encoder | Pulse counter input |
| Energy | Main supply | Energy analyser with Modbus output |
| Health (maintenance) | Bearings, motor housing | Vibration / temperature sensor |
Step-by-Step Implementation
- Prioritise machines: Start with bottleneck and high-value machines; there is no need to connect the whole park at once.
- Discover the signals: For each machine, determine with electrical maintenance which contact or lamp in the electrical panel means “running”.
- Validate the count signal: Exactly one pulse should come per cycle; double counting or skipping is the most common problem.
- Choose the transport method: If there is a cable tray, an input module + Ethernet; if not, a wireless IoT node.
- Add an operator terminal: The machine says “stopped” but cannot say “why”. The HMI terminal completes the downtime and scrap reason and the work order selection.
- One week of parallel validation: Compare the system count with the shift report; if there is a deviation, correct the sensor position.
Common Mistakes
- Counting an idling motor as production: set the current threshold above no-load running or combine it with the cycle signal.
- Placing the sensor where the operator intervenes: a photoelectric sensor blocked by accident counts the whole day wrong.
- Ignoring electrical noise: a signal cable running next to a drive produces false pulses; shielded cable and proper earthing are essential.
- Collecting data without context: without work order and product matching, count information does not serve planning.
Frequently Asked Questions
Does retrofit require intervening in the machine?
Is data collected with retrofit enough for OEE?
Should wireless or wired be preferred?
Retrofit in EFFIX MES
For machines without communication capability, EFFIX MES uses the Inolink wireless IoT network: the node fitted to the machine transmits the running signal and cycle counter to the centre without cabling, and the system turns this signal into automatic downtime records and production counts. The operator completes the downtime reason, scrap and work order information on the HMI terminal; this way an old machine appears on the same OEE, downtime analysis and Andon boards as a modern PLC-controlled machine. Energy analysers are read via Modbus and machine-level consumption is tracked through the SEM integration. For details, see the EFFIX MES page or request a demo.